Here are the cost estimates from the Bryan Park Watershed Study. 

Site

Item

Activity

Cost

Total

Princeton Creek

Bank Stabilization

Land Survey

$ 10,000

Engineering Design

$ 19,400

Construction Supervision

$ 6,000

Stream Stabilization Measures

$ 179,068

$ 214,468

Horsepen Branch

Site 6 Stream & Riparian Restorations

Land Survey*

$ 15,000

Engineering Design

$ 19,800

Construction Supervision

$ 6,000

Stream Channel Restoration*

$ 20,500

Re-Forestation*

$ 2,000

$ 63,300

Lower Pond

Pond Wall Restoration & Forebay Access Road

Survey of Wall*

$ 10,000

Engineering Design*

$ 10,000

Construction, Concept II*

$ 18,956

Forebay Access Road

$ 1,204

$ 40,160

Total

$ 317,928

*Where the consultant gave a range of prices, this table contains the high estimate.

The consultant estimates that the Pond dredging will take another $200,000 to $500,000.

See the map for the locations of these projects.  See the Princeton Creek page for a problem the consultant does not discuss.